The Concrete Pump Operator is responsible for the safe and efficient operation of concrete pump trucks at construction sites.
Key Duties and Responsibilities
-
Set up and operate concrete pump truck in accordance with site plans and safety standards.
-
Conduct daily pre-operation inspections and perform minor maintenance tasks.
-
Coordinate with mixer truck drivers and site personnel to ensure proper timing and sequence of concrete pouring.
-
Monitor pump pressure and concrete flow to avoid blockages, overflows, or equipment damage.
-
Clean and maintain equipment after use.
-
Keep accurate records of volumes pumped, start/stop times, and operational issues.
-
Adhere to all company health, safety, and environmental (HSE) procedures.
-
Be willing to work at multiple project sites and under various weather conditions.
Qualification, Skills, and Experience
-
Certificate or formal training in concrete pump operations from a recognized institution.
-
Valid heavy vehicle driver’s license
-
At least 2–3 years of experience in operating concrete pumps in civil or construction projects.
-
Knowledge of concrete mixes, pump operation, and site safety practices.
-
Ability to perform minor troubleshooting and maintenance on the pump truck.
-
Team player with good communication and coordination skills.
-
Strong safety awareness and discipline.
-
Reliable, punctual, and adaptable. Mota





